A holiday house once stood on a sloping plot above the Berounka river inside the Křivoklátsko protected landscape area. It is gone, and our task was to document its replacement. For private clients we prepared the design documentation for the permit application, covering a modular timber building set on a masonry basement.
The brief was a new holiday house on a plot that falls towards the Berounka river and sits inside the Křivoklátsko protected landscape area. An older recreational building stood on the same plot and has been demolished, so in substance this is a new building replacing one that no longer exists. The clients are private individuals, which is why the client field reads as anonymised. The goal was the Czech DSP stage, the design documentation submitted with a combined planning and building permit application.
The work is grounded in site data. We laser scanned the plot and registered the scans into a single point cloud, and the coordinates of the foundation slab were available from a measured survey. Surveying and design sit in the same office here, so the point cloud fed straight into the model. Older material existed as well, a design by another practice from 2017 and a geotechnical investigation from 2018. Material of that age is input rather than a finished answer, because both the brief and the regulations move on in the meantime. A BIM model was then built in Revit, including the interior fit out with sanitary ware, furniture and openings, and the drawings were generated from that model. An IFC exchange model kept the structural engineer working on the same geometry as the architectural team.
The house has three levels. A club room with services in the basement, a living room with a kitchen area and a terrace on the ground floor, two bedrooms and a bathroom above. That adds up to roughly 135 m² of floor area and about 520 m³ of enclosed volume. The pitched roof rises at 35° and carries a standing seam metal covering, and heating is designed as an air to water heat pump with underfloor distribution. No new utility connections are created, the building ties into an existing well and an existing wastewater tank. The clients signed off the concept over a set of visualisations and floor plans before the drawing set was finalised. Detailed design for construction was outside the scope of this commission and the permit stage does not replace it. The model the set was generated from is the usual starting point for that next stage.
The hardest part is joining two different worlds. The upper part of the house is a catalogue timber module with fixed dimensions and fixed build ups. The basement is the opposite, individually designed masonry set into a slope. The two have to meet precisely and satisfy the fire and structural assessments at the same time, so they are resolved in parallel rather than one after the other. The site adds its own constraints. A sloping plot inside a protected landscape area drives the siting, the levels and the appearance of the building, and those are exactly the points an authority asks about. The third issue is language. When a new building replaces one that has been demolished, the vocabulary of new build and of reconstruction tends to get mixed in the documents. Factually it is a new building on the same plot, and every part of the documentation has to say so consistently.
Older designs and investigations for the plot are reviewed to establish what still holds and what has to be verified again.
Laser scanning complemented by a measured survey of the foundation slab coordinates.
Registration of the point cloud and construction of the Revit model, including the interior and the build ups.
The coordination model is exchanged with the structural engineer, the fire safety design is tied in and the drawings are generated from the model.
The complete permit stage set is assembled, handed over to the clients and later revisions are incorporated.
The site is captured with a laser scanner and the individual scans are registered into a single point cloud.
The surveyor records the coordinates of the foundation slab so that the building and the drawings sit in one coordinate and height system.
A model of the house including its interior is built on the survey data, and the plans, sections and elevations are generated from it.
The structural engineer receives the model in the open IFC format, so both sides work on the same geometry.
Rendered views and axonometrics let the clients see the result before the drawing set is finalised.