    Creation of a Switchboard Diagram for the Decathlon Building in České Budějovice

    Creation of a Switchboard Diagram for the Decathlon Building in České Budějovice

    Client

    Decathlon

    Year

    2025

    Locality

    České Budějovice

    The subject of the contract was the creation of a schematic as-built documentation of the retail and storage areas of the Decathlon store in České Budějovice. The primary goal of the project was to map the existing layout of the hall and precisely document the locations of key electrical installation elements.

    Project timeline

    1

    Building Surveying

    Surveying of the interiors and electrical installations using mobile scanning.

    2

    Data Processing and Documentation Creation

    Drafting of technical drawings for the electrical installation in a CAD system.

    3

    Project Handover

    2D floor plan drawings of the building with recorded electrical installations, including appliances, alongside the switchboard diagrams.

    Technologies used

    Mobile (SLAM) Scanning

    Efficient surveying of large areas of the facility with minimal disruption to ongoing store operations.