Back to projects
    Electrical Switchboard Documentation for the Decathlon Building in České Budějovice

    Electrical Switchboard Documentation for the Decathlon Building in České Budějovice

    Client

    Decathlon

    Year

    2025

    Locality

    České Budějovice

    For Decathlon, we prepared a schematic building passport focused on documenting the electrical installation and creating electrical switchboard documentation. The objective was to produce clear and reliable documentation of the existing electrical systems to support facility management, orientation within the building infrastructure, and future maintenance activities.


    The project included surveying the building and preparing schematic floor plans showing individual rooms, their areas, and the approximate locations of electrical components, particularly power outlets, lighting fixtures, and electrical switchboards.


    The result is a clear 2D as-built documentation package enriched with information about the location of selected electrical equipment and electrical switchboard documentation, providing a practical basis for facility management and maintenance.


    Project Challenges

    The project was carried out while the retail store remained fully operational, which significantly affected the surveying process. The interior was fully equipped with retail furniture and merchandise, making it impossible to visually identify every power outlet and other electrical components.

    The surveying team therefore had to carefully record all accessible information on site and pass it to the documentation specialists. During the preparation of the drawings, the collected information had to be verified, logically interpreted, and incorporated into the documentation to ensure it reflected the actual condition of the building as accurately as possible.


    Project Deliverables

    • Schematic building passport
    • 2D floor plans
    • Floor plans showing rooms and their dimensions
    • Drawings indicating the locations of power outlets, lighting fixtures, and electrical switchboards
    • Electrical switchboard documentation


    Project timeline

    1

    Building Assessment

    Inspection of the building and identification of electrical components required for the documentation.

    2

    Building Survey

    Collection of information about the existing building, including the locations of power outlets, lighting fixtures, and electrical switchboards while the store remained in full operation.

    3

    Preparation of the Schematic Building Passport

    Creation of schematic floor plans showing rooms, floor areas, and the approximate locations of electrical components.

    4

    Electrical Switchboard Documentation

    Preparation of electrical switchboard documentation to support facility management and maintenance.

    5

    Quality Review and Delivery

    Final review of the documentation and delivery of all project outputs to the client.

    Technologies used

    Mobile SLAM Laser Scanning

    Efficient surveying of large areas while minimizing disruption to the daily operation of the retail store.